Archive for November, 2010

Proudly showing off my work

Friday, November 12th, 2010

AREVA Solar completed the design, construction, and commissioning of SSG4 at Kimberlina Power Station this year. In this Power Tech Tour, I describe the design and operation of this first of its kind Once Through Solar Steam Generator, which is capable of producing superheated steam at 100 bar/450C.